Plot Plan Sample Clauses

POPULAR SAMPLE Copied 1 times
Plot Plan. Licensee shall submit a final plot plan (layout) of the event for review and approval by the Director or his designee at least fourteen (14) business days in advance of the set-up date. The plot plan shall also include a security plan, traffic control, trash removal, location and amount of temporary restrooms and parking. The Director or his designee will notify the Licensee of any required changes and/or approval before set-up date.
Plot Plan. The construction drawings must include a Plot Plan designated as such on the drawing and consisting of one sheet only. The Plot Plan serves as the basis for the Site Memorandum. All work shall be sited on the plot plan to scale. In the absence of written consent of the Owner in advance, the Plot Plan shall comply with The Policy.
Plot Plan. The Ash 24 location was second year beets. Irrigated on October 7, using sprinklers. PB: Clothianidin seed treatment. G: grower’s treatment (imidicloprid + chlorantraniliprole. Grey plots are grower’s treatments similar to G. All plots were treated with esfenvalerate via sprinkler irrigation. Season long materials applied and amounts are in Table 6.2).
Plot Plan. Buyer shall be provided with a "plot plan" prepared by Seller for the Lot, which will show various information specific to the Lot, such as, but not limited to, the approximate location of utilities and their connection
Plot Plan. Fully dimensioned or drawn to scale with scale indicated on plans. All property boundaries are clearly marked or parcel size shown. Benchmark & north arrow are shown. All setbacks are met as established by code and listed below Legal description of parcel/location information is shown. Any nearby existing septic systems or xxxxx are shown. Ordinary high water mark (OHWM) is referenced if applicable. “All Weather Road” located within 25 feet of tank service manholes is depicted, if not individual site design required. (Note: Means a gravel or paved surface that can support a fully loaded pump truck in all seasons.)

Related to Plot Plan

  • Improvement Plan A detailed, written plan collaboratively developed between the teacher and evaluator, utilized solely when a teacher receives an Evaluation Rating of ineffective. The approved form for the Improvement Plan is attached to this agreement.

  • Master Plan The School shall prepare its own facility master plan in compliance with the rules of the Public School Capital Outlay Council and the Public Schools Capital Outlay Actxxvi.

  • Implementation Plan The Authority shall cause to be prepared an Implementation Plan meeting the requirements of Public Utilities Code Section 366.2 and any applicable Public Utilities Commission regulations as soon after the Effective Date as reasonably practicable. The Implementation Plan shall not be filed with the Public Utilities Commission until it is approved by the Board in the manner provided by Section 4.9.

  • First Source Hiring Program Contractor must comply with all of the provisions of the First Source Hiring Program, Chapter 83 of the San Francisco Administrative Code, that apply to this Agreement, and Contractor is subject to the enforcement and penalty provisions in Chapter 83.

  • Prescription Plan The PPO plan will include a comprehensive prescription 37 program: 38

OSZAR »