Portable Document Format Sample Clauses

POPULAR SAMPLE Copied 1 times
Portable Document Format. Prime Billing First time billing or xxxxxxxx of original documents (like coupons, air waybills) are referred to as Prime Xxxxxxxx Processing Dashboard Module in SIS for: • Viewing processing details • Submitting of invoices/files for late processing • Increment the period of the invoices Protest Protest is the action taken by a billed entity against an erroneous billing done by a billing entity before the amount in error is settled by the Clearing House. RAM Revenue Accounting Manual Reason Code A two character code to be assigned to each Rejection Memo, Billing Memos as well as Credit Memos to indicate the reason for raising a Memo; THIS CHAPTER IS TO BE APPLIED BY ALL SIGNATORIES TO THE STANDARD AGREEMENT FOR SIMPLIFIED INVOICING AND SETTLEMENT (SIS) Receivables Invoices billed to other interline partners is referred to as Receivables Record 50 file Record 50 is the file used today in First & Final™ for Post Sales Processing. This file has been modified in SIS is now called “Usage File”. Reference Data Reference data relates to the basic legal information of theBilling and Billed entity. This includes details like the Company Legal Name, Tax Registration ID, Address details etc. RM Rejection Memos Sanity Check This is the first phase of SIS-Validation, where a file is checked for Construction errors. If an error is encountered in this phase the entire file is rejected by SIS. Settlement Method Indicator The field Settlement Method Indicator in the Invoice data drives the Settlement process of the Invoice. SIS Simplified Invoicing and Settlement (SIS) SIS Operations User for SIS operations SITA Provider of global information and telecommunication solutions for the air transport industry. SPA Special Prorate Agreement Submissions Open Date The date and time from which SIS starts accepting Billing Files for a particular Clearance period Supporting Attachments The additional documentation provided to support interline billing claim. The Supporting Attachments needs to be provided in electronic format Supporting Attachments Linking Deadline The date and time stamp by which the system will stop manual and automated linking of supporting documents for the clear- ance period TIFF Image files Tagged Image File Format (TIFF) is a file format for storing images. Time Stamp Sequence of characters, denoting the date and/or time at which a certain event occurred UATP Universal Air Travel Plan, an Industry owned charge card Usage File The modified Record 50 file is now...
Portable Document Format. The Company shall be entitled to rely on delivery by portable document format of an executed copy of this Subscription Agreement, including the completed schedules attached hereto, and acceptance by the Company of such portable document format copy shall be legally effective to create a valid and binding agreement between the Purchaser and each Beneficial Purchaser, if any, and the Company in accordance with the terms hereof.
Portable Document Format pdf. Bidders may list additional electronic document formats they provide remediation services for, such as formats used for eBooks or other products. We can provide a variety of document remediation services, please see Accessible Web Attachment 1 - Document Remediation Pricing below.
Portable Document Format. (.pdf) formats. The Contractor shall ensure that the Documentation is prepared in high quality English language using appropriate terminology, and the Contractor shall in this respect ensure proof reading by a person proficient in the use of the English language and undertake other relevant measures prior to submission of the Documentation to the Company.

Related to Portable Document Format

  • Exhibits/Schedules The Exhibits and Schedules to this Agreement are hereby incorporated and made a part hereof and are an integral part of this Agreement. All Exhibits and Schedules annexed hereto or referred to herein are hereby incorporated in and made a part of this Agreement as if set forth in full herein. Any capitalized terms used in any Schedule or Exhibit but not otherwise defined therein shall be defined as set forth in this Agreement.

  • Voltage Schedules Once the Developer has synchronized the Large Generating Facility with the New York State Transmission System, NYISO shall require Developer to operate the Large Generating Facility to produce or absorb reactive power within the design capability of the Large Generating Facility set forth in Article 9.5.1 (Power Factor Design Criteria). NYISO’s voltage schedules shall treat all sources of reactive power in the New York Control Area in an equitable and not unduly discriminatory manner. NYISO shall exercise Reasonable Efforts to provide Developer with such schedules in accordance with NYISO procedures, and may make changes to such schedules as necessary to maintain the reliability of the New York State Transmission System. Developer shall operate the Large Generating Facility to maintain the specified output voltage or power factor at the Point of Interconnection within the design capability of the Large Generating Facility set forth in Article 9.5.1 (Power Factor Design Criteria) as directed by the Connecting Transmission Owner’s System Operator or the NYISO. If Developer is unable to maintain the specified voltage or power factor, it shall promptly notify NYISO.

  • Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.4.2 As a part of Construction Documents Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Architect/Engineer shall demonstrate and provide written assurance to Owner that all conflicts/collisions between models have been resolved. 1.4.3 The Architect/Engineer shall consult with the Owner and Construction Manager on matters such as construction phasing and scheduling, bid or proposal alternates, liquidated damages, the construction contract time period, and other construction issues appropriate for the Project. The Architect/Engineer shall assist the Owner and Construction Manager in the preparation of the necessary bidding information, bidding forms, RFP information, and RFP forms, and the Conditions of the Contract. 1.4.4 The Architect/Engineer shall assist the Owner in connection with the Owner’s responsibility and procedures for obtaining approval of all building and accessibility authorities having jurisdiction over the Project. 1.4.5 The Architect/Engineer shall provide coordination and inclusion of sequence of operations for all operable systems in the facility as defined by Owner during Design Development. 1.4.6 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.4.7 The Architect/Engineer shall participate in a final review of the Construction Documents and model(s) with the Owner and Construction Manager at the Project location or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Construction Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments. 1.4.8 Before proceeding into the Bidding and Proposal Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Construction Documents and approval of the Final Amount Available for the Construction Contract as approved by the Board of Regents.

  • DELIVERY SCHEDULES In accordance with the "Non-State Agencies Participation in Centralized Contracts” and “Extension of Use” clauses herein, this Contract is extended to local governments, political subdivisions and others authorized by law as well as State agencies. The Delivery Schedules (based on Requirement Letter RL182) are available as a guide to indicate proposed delivery points and estimated annual requirements. Delivery Schedules may be revised or clarified as necessary. Any specific questions regarding the site conditions should be directed to the end-user at the telephone number shown on the Delivery Schedule. The Delivery Schedules are available upon request. Contractors shall be obligated to deliver under the Contract to any State agency which places a purchase order under the Contract, whether or not such delivery location is identified in the Delivery Schedules. Any political subdivision or other non-State entity which has not filed a requirement with OGS as of the date of the bid opening shall be eligible to receive deliveries at Contractor's option only, upon placement of a valid purchase order to the Contractor's address as indicated in the award. Contracts created by OGS in response to receipt of Filed Requirements are considered to be binding. At Contractor's request, Contractor will be advised in writing regarding political subdivisions or other Non-State entities which have filed on a timely basis but do not appear on the Delivery Schedule. Where “Standby” is indicated in the Delivery Schedule, this reflects those facilities which normally use a fuel supply (i.e. natural gas) other than fuel oil and will only use fuel oil when alternate fuel is unavailable.

  • Outage Schedules The Connecting Transmission Owner shall post scheduled outages of its transmission facilities on the NYISO OASIS. Developer shall submit its planned maintenance schedules for the Large Generating Facility to Connecting Transmission Owner and NYISO for a minimum of a rolling thirty-six month period. Developer shall update its planned maintenance schedules as necessary. NYISO may direct, or the Connecting Transmission Owner may request, Developer to reschedule its maintenance as necessary to maintain the reliability of the New York State Transmission System. Compensation to Developer for any additional direct costs that the Developer incurs as a result of rescheduling maintenance, including any additional overtime, breaking of maintenance contracts or other costs above and beyond the cost the Developer would have incurred absent the request to reschedule maintenance, shall be in accordance with the ISO OATT. Developer will not be eligible to receive compensation, if during the twelve (12) months prior to the date of the scheduled maintenance, the Developer had modified its schedule of maintenance activities other than at the direction of the NYISO or request of the Connecting Transmission Owner.

OSZAR »